PROJ11 — Project Variations
Operational Reports > Project
Who would use this report?
Project managers and operational staff
What is in this report?
proj11Detail of variations logged against projects.
How do I use it?
Sort options:
-
Sort By — sortArrange elements of a list in a certain order. The most-used orders are numerical order and lexicographical order. by project, parent project, customer, or projectIn Framework Manager, a set of models, packages, and related information for administration, and for sharing model information.In Metric Studio, a project is a task or set of tasks undertaken by a team and monitored on a scorecard. A project tracks the dates, resources and status of the project.In Metric Designer, a project is a group of extracts. Each extract contains the metadata that is used to populate the Metric Studio data store or to create applications. manager
-
Secondary Sort By — specify a secondary sort order
FiltersSelectively remove data from view. include:
Project Level — specify whether you want to see the project or parentA member of a hierarchy to which the child members belong. The “Parent” function is part of the family set of functions and returns the parent member of the specified member. For example: SELECT Parent( [Time].[Year].[Period].[July 2010] ) ON Rows FROM [General Ledger] Result: 2010 (the year 2010 is the parent of [July 2010]) project for the following filters:
-
Project/Parent Project — provides search options:
- Project Code Entry — enter either a single project code, or a range
- Project Code Search — search by Project Code and multi select
-
Project Customer/Parent Project Customer — provides search options:
- Customer Code Entry — enter either a single customer code, or a range
- Customer Code Search — search by customer code and multi select
- Keyword Search — search through all customer keywords
Other project master related filters include Project Manager, Project Branch, or Parent Project Manager and Parent Project Branch.
Other non-project master related filters include Variation Status and Variation Type.
What can I do in the report?
You can sort by project, parent project, customer, or project manager.
Right-click any of the drill-down links and select Open link in new tab to viewA set of data connected to a cube, deliberately laid out to communicate business information. the data in pxiPronto Xi.